The Pennsylvania Convention Center Expansion
Completed in 2011 the project expansion enlarged the convention facility by 793,000 square feet. As the only electrical contractor on the project we were responsible for all aspects of lighting, power, life safety and communications. We were a subcontractor to Keating Building Corporation.
-
Church of the Holy Trinity
In 1995 the Gordon Group was hired to furnish and install a new incoming electrical service to the church along with replacing all existing interior wiring. Incorporated into this project was the refurbishing of the existing light fixtures along with the installation of exterior lighting to illuminate the façade and stain glass windows. We were…
-
Avenue of the Arts
Completed in phases between the years of 2008 to 2010 the project involved the installation of color changing LED lights on multiple buildings. All lighting was connected together thru a wireless link controlled from a single central location. We were a prime contractor to the Center City District of Philadelphia.
-
Temple University Morgan Hall Midrise Dorm
Completed in 2013 the Gordon Group was responsible for the furnishing and installing the 13,200 volt medium voltage equipment and 600 KW emergency generator that serviced the entire 660,000 square foot student housing, dinning and retail complex. We were also responsible for the lighting, power and fit out of the 10 story 674 bed midrise…
-
The School District of Philadelphia Administration Building
Completed in 2004 we were responsible for the tenant fit out of this 4 story building which included a computer data center backed up by a 1,000KW generator and uninterruptable power system. We were a subcontractor to Turner Construction Company.
-
10 Rittenhouse Condominiums
Completed for occupancy in 2009 this 33 story luxury condo building has 134 units ranging in size from 500 to 10,700 square feet. The Gordon Group was responsible for all phases of electrical and low voltage life safety systems for both the core and shell project along with the individual unit fit outs. We were…
-
University of Pennsylvania Museum of Archaeology & Anthropology Mainwaring Wing
Completed in 2002, the four-level addition was built as a collections, examination and storage area. The Gordon Group was responsible for all aspects of lighting, power, life safety and communications. We were a subcontractor to Turner Construction Company.
-
Children’s Hospital of Philadelphia Research Facility
Completed in 2009 this is 773,000 square foot 12 story research facility consisting of offices, cafeteria, conference rooms and 4 floors of research laboratories. Our responsibly consisted of the lighting and power fit out work in the building. We were a subcontractor to Turner Construction Company.