  • One Crescent Drive

    One Crescent Drive

    Completed in 2005 this four-story building, designed by A M Stern, was the first building in the country to receive a LEED platinum rating from the US Green Building Council. The Gordon Group was responsible for temporary and permanent Power distribution throughout the building, along with lighting and power in all common areas, life safety…

  • Cira Center

    Cira Center

    Completed in 2005 this 29-story 732,000 square-foot building was designed by Cesar Pelli. The Gordon Group was responsible for temporary and permanent Power distribution throughout the building… grounding and lightning protection… lighting and power in all common areas… and tenant fit-out for 15 floors. We were a subcontractor to Turner Construction Company.

  • Glaxo Smith Kline

    Glaxo Smith Kline

    Completed in 2013 this is a four-story 208,000 square-foot building including a 900-car parking lot. As a subcontractor to the L. F. Driscoll Company, the Gordon Group was responsible for power distribution throughout the building, lighting and power in all common areas, life safety systems and parking lot lighting.

  • Barnes Museum

    Barnes Museum

    Completed in 2012 this is a 93,000 square foot museum with a 150 seat auditorium and 50 seat café. We were responsible for furnishing and installing the lighting, lighting controls and 120 volt power to receptacles and miscellaneous equipment. We were a subcontractor to the L. F. Driscoll Company.

  • Battleship New Jersey Visitors Center

    Battleship New Jersey Visitors Center

    Completed in 2001 this visitor’s center and ticket sales office serves as the gateway to the historic battleship New Jersey. The Gordon Group was responsible for: Lighting, power, telecommunications wiring, fire alarm system, security system installation, lightning protection and point of sales wiring. We were a subcontractor to Anvil Construction Company.

  • Sugar House Casino

    Sugar House Casino

    Completed in 2010 this is a 1,300,000 square foot casino with over 3,000 slot machines and a host of gaming tables. The Gordon Group had responsibility for all interior and exterior electrical work associated with this project, working as a subcontractor to Keating Building Corporation.

  • Lincoln Financial Field

    Lincoln Financial Field

    Completed in 2003, Philadelphia Eagles’ football stadium has the capacity to seat over 68,000 spectators. The Gordon Group had responsibilities for: incoming construction power, rough in of all underground high voltage and phone/data conduit systems, parking lot lighting and power, Video displays, various stores and kiosk fit outs, the red zone super box fit outs…

  • Philadelphia High School for the Creative & Performing Arts

    Philadelphia High School for the Creative & Performing Arts

    Completed in 1997 this was a new facility built into the rear of the historic old Ridgway Library. The Gordon Group had responsibility for all power, lighting and low voltage systems electrical work associated with this project. We were a prime contractor to the Philadelphia School District.

  • Kimmel Center for the Performing Arts

    Kimmel Center for the Performing Arts

    Completed in 2001 this glass vaulted building has two separate auditoriums with a combined seating of 3,150 patrons. The Gordon Group had responsibilities for the empty underground systems and power conduit rough in, store fit out, and the furnishing and installation of the fire alarm and security systems. We were a subcontractor to the L.…

  • Luis Munuz Marin Elementary School

    Luis Munuz Marin Elementary School

    Completed in 1997 this was a new 120,000 square foot school. The Gordon Group had responsibility for all power lighting and low voltage systems electrical work associated with this project. We were a prime contractor to the Philadelphia School District.